Our First Day of Work in Shell, WY - July 20th

Posted by: Jeff Holtgeerts in M&EGeneral on Print PDF

  

The construction site at the back of the Shell Community Church was very active today as we built forms for a new sidewalk, installed insulation, began installing soffits, and started hanging sheetrock on the ceiling.  Tomorrow we hope to finish the soffits and complete all the sheetrock, except for the utility room which still needs to be plumbed.  Overall, the job has been very enjoyable with a variety of tasks and a lot of productivity.  Although we were warm throughout the day, it was never overbearing and a lot of our work is indoors or in the shade.  Just before we stopped work for the day, our missing load of siding and windows/doors arrived.  That means Wednesday we will likely begin our anticipated task of installing siding - our original assignment.

Our devotionals and group Bible studies have been exploring methods of inductive Bible studies, then we discuss them and hold each other accountable.  Today we studied the Bread of Life passage in John 6, and tomorrow we'll study the Light of the World passage in John 8.

Thanks for all your prayers.

Comments (0)Add Comment

Write comment
You must be logged in to post a comment. Please register if you do not have an account yet.

busy